Second image: Standing inside 7 Elm street, the sheet rock from the wall adjoining 3 and 7 Elm has been removed. In both images the old flooring has been removed, the plywood sanded, the walls have been stripped, and the lovely dilapidated New England Patriots wall banner is nowhere to be seen...
Wednesday, February 24, 2010
Design Center Renovations Underway
Renovations under in full swing on the new design center in Court Square. First image: this corner was once the private office of the previous tenant-a jeweler, the walls came down to give us more studio space for UMass Amherst students and faculty. .
Second image: Standing inside 7 Elm street, the sheet rock from the wall adjoining 3 and 7 Elm has been removed. In both images the old flooring has been removed, the plywood sanded, the walls have been stripped, and the lovely dilapidated New England Patriots wall banner is nowhere to be seen...
Second image: Standing inside 7 Elm street, the sheet rock from the wall adjoining 3 and 7 Elm has been removed. In both images the old flooring has been removed, the plywood sanded, the walls have been stripped, and the lovely dilapidated New England Patriots wall banner is nowhere to be seen...
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment